ENGINEERING
Steel Fabrication
Sheet Metal
Machining
Prototyping
Capacity
FINISHING
Powder Coating
Stove Enamelling
Surface Preparation
EXPERIENCE
Architectural
Structural
Precision
Site Work
Refurbishment
Colour Charts
RAL
BS4800
BS381C
Pantone

Site Work

Below are some examples of the site work that we have carried out.

Statue refurbishment

In 2005 we were contracted to refurbish 60 statues from along the Thames Embankment, each of which weighed several tons. This required the use of a specialist lifting vehicle and careful planning because the statues were in a public area.

Forecourt Fittings

The water and air dispenser shown below was part of a complete installation carried out by IDL Colour Coating within an active petrol station forecourt. IDL were responsible for the installation, fitting and on site safety management.

 

 

 

 

 

 

------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------


Metal Finishing


Fabrication


Site Work


IDL Group - Unit 6 - Cumberland Works - Wintersell's Road - Byfleet - Surrey - KT14 7LF
Tel: 01932 355 894 - Fax: 01932 336 479 - E-mail:
sales@idluk.com